White Shaker cabinets installed in a new-construction kitchen

New Construction Kitchen Cabinets: A Builder and Homeowner's Guide

Published •Updated •5 min read

Cabinets in a new-construction kitchen involve more coordination than a remodel, simply because so many other trades — electrical, plumbing, flooring — are moving at the same time. Getting the sequencing right is what keeps a build on schedule.

When to Order Cabinets in the Build Timeline

Cabinets should be selected and ordered well before framing is finished, since lead times for building and finishing cabinetry run several weeks and builders need a firm layout to coordinate electrical outlet placement, plumbing rough-ins, and lighting.

Coordinating With Other Trades

  • Electrical: outlet and under-cabinet lighting placement needs to be finalized against the cabinet layout, not guessed at
  • Plumbing: sink and dishwasher rough-in locations need to match the cabinet plan exactly
  • Flooring: whether flooring runs under cabinets or stops at them affects final height calculations

Working Directly With Builders

In new construction, the cabinet installer should coordinate with the builder or general contractor so cabinets go in at the right stage — not too early (risking damage from other ongoing work) and not so late that it holds up flooring, backsplash, or final inspection.

Cabinet Choices That Work Well for New Builds

Because new construction kitchens are built from a blank layout rather than working around an existing footprint, this is the best-case scenario for getting storage exactly right — full-height pantry cabinets, a large island with dedicated storage, and cabinet depths that aren't compromised by an existing plumbing wall.

Frequently Asked Questions

When should cabinets be ordered for new construction?

As early as possible once the layout is final, because cabinet lead times can run several weeks or more, and the layout affects outlet, plumbing and lighting placement.

When are cabinets installed in new construction?

After drywall and painting are far enough along, and before countertops, which are templated once the base cabinets are installed and level.

Who coordinates cabinets in a new build?

Usually the builder or general contractor coordinates the trades, working with the cabinet installer on timing.

Whether You're a Builder or a Homeowner

Mega Solutions sells and installs kitchen cabinets and installs granite, quartz, quartzite and marble countertops. Reach out early in your build timeline so cabinet lead times don't hold up your move-in date. See cabinet lead times.

Ready to start your kitchen project?

Get a free, no-obligation quote from Mega Solutions. We'll walk through your space and put together a plan that fits your budget.

MEGASOLUTIONS

Custom cabinets and stone countertops, designed and installed by a team that treats your home like our own.

Contact

Business Hours

  • Monday – Friday9:00 AM – 5:00 PM
  • Saturday10:00 AM – 2:00 PM
  • SundayClosed