Kitchen with white cabinets and a dark stone-topped island

How Long Does a Kitchen Remodel Take?

Published •Updated •7 min read

Fixr puts the average full kitchen remodel at about 6 to 12 weeks of work, for a project with new stock cabinets, countertops, flooring, appliances and fixtures. That doesn't include planning and hiring. Projects that remove load-bearing walls, move plumbing or use custom cabinets can take 3 to 8 months from start to finish. The biggest variable is usually the cabinet lead time, not the installation itself.

Timeline at a Glance

Typical remodel phases (Fixr, published January 2025)
PhaseTypical time
DemolitionAbout 1-3 weeks
Construction (plumbing, electrical, flooring, cabinets, countertops)About 4-6 weeks, up to 8 months for complex projects
Finishes (paint, backsplash, appliances)About 1-3 weeks

Cabinets: Lead Time Is the Long Pole

Cabinet delivery and installation (Fixr)
Cabinet typeDeliveryInstallation
StockAbout 1-2 weeksAbout 2-3 days
Semi-customAbout 4-8 weeksAbout 2-3 days
CustomAbout 3-6 months or longerA few days

Other guides give similar ranges. This Old House puts stock at about 1 to 5 weeks, semi-custom at 5 to 6 weeks and custom at 8 weeks to 6 months. Order as soon as the layout and appliance sizes are final. See cabinet lead times.

Countertops

Stone countertops are templated after the base cabinets are installed. Fixr's granite guide puts the time from templating to installation at about 2 to 3 weeks. Choosing your stone early helps keep that gap short. See the countertop installation process.

Smaller Projects Move Faster

  • Cabinet replacement only: delivery plus a few days of installation.
  • Countertop replacement only: templating, about 2 to 3 weeks of fabrication, then a short installation visit.
  • Cosmetic updates: Fixr notes that a project limited to refacing cabinets and replacing plumbing and electrical fixtures can take about a week or two.

What Makes a Remodel Take Longer

  • Custom cabinets and high-end appliances, which Fixr calls the two biggest timeline extenders
  • Moving walls, plumbing or gas lines, and the permits that come with them
  • Surprises in older homes, such as hazardous materials or hidden damage
  • Changes after ordering
  • Waiting on multiple trades to coordinate

How to Keep It on Schedule

  1. 1Finalize the design, appliances and stone before demolition starts.
  2. 2Order cabinets early and schedule demolition around delivery.
  3. 3Plan cabinets and countertops together so templating happens right after installation.
  4. 4Set up a temporary kitchen.

See the full kitchen renovation planning checklist.

Frequently Asked Questions

How long does a kitchen remodel take?

Fixr puts the average full remodel at about 6 to 12 weeks of work, not counting planning. Complex projects with structural changes or custom cabinets can take 3 to 8 months.

How long does cabinet installation take?

Fixr puts installation at about 2 to 3 days for stock or semi-custom cabinets, after delivery.

How long after cabinets are countertops installed?

Stone is templated after the base cabinets are in; Fixr puts granite at about 2 to 3 weeks from templating to installation.

What delays kitchen remodels most?

Custom cabinet and appliance lead times, structural or plumbing changes, permits, and changes after ordering.

Planning Cabinets and Countertops? Get a Quote from Mega Solutions

Mega Solutions sells and installs kitchen cabinets and installs granite, quartz, quartzite and marble countertops, so both can be planned on one schedule. Request a personalized quote based on your measurements and project details.

Sources

  • Fixr, "How Long Does a Kitchen Remodel Take?" (published January 2025): fixr.com
  • Fixr, "Granite Countertop Installation Cost" (updated January 2025): fixr.com
  • This Old House, "All About Kitchen Cabinets" (updated June 2026): thisoldhouse.com

Ready to start your kitchen project?

Get a free, no-obligation quote from Mega Solutions. We'll walk through your space and put together a plan that fits your budget.

MEGASOLUTIONS

Custom cabinets and stone countertops, designed and installed by a team that treats your home like our own.

Contact

Business Hours

  • Monday – Friday9:00 AM – 5:00 PM
  • Saturday10:00 AM – 2:00 PM
  • SundayClosed

© 2026 Mega Solutions. All rights reserved.

Serving metro Atlanta and the Augusta–Aiken area

Call Now — (470) 241-0524